The California Water Boards' Annual Performance Report - Fiscal Year 2014-15

REGULATE: NPDES STORMWATER

GROUP: NPDES STORMWATER CONSTRUCTION FACILITIES
MEASURE:
NUMBER OF ENROLLEES ACTIVE, NEW AND TERMINATED 
 
MESSAGE:  
In FY 2014-15, 2,823 new facilities enrolled in the Storm Water Construction Program. And, due to the construction projects ending, 2,303 permits were rescinded.
Key Statistics for FY 2014-15
Number of Active Facilities
Enrolled (as of June 30)
6,827
New Facilities Enrolled in FY 14-152,804
Terminated Enrollees During FY 14-152,308

MEASUREMENTS  - Data Last Updated on:  06-24-2016 (8:54 am)

RegionActive Number
of Facilities
Enrolled (as of June 30)
New Facilities
Enrolled in
FY 14-15
Terminated
Enrollees
During
FY 14-15
11496965
21,044469369
3499176136
41,175440371
51,492737623
62858188
72288571
81,040422323
9915325261
TOTAL6,8272,8042,308
abcdefhiklmnopqrstuvwxyzChart type not supported.FusionCharts XT Trial

 

abcdefhiklmnopqrstuvwxyzChart type not supported.FusionCharts XT Trial

WHAT THE MEASURE IS SHOWING

In Fiscal Year (FY) 2014-15, the Storm Water Construction Program added 2,823 new or updated enrollees and terminated 2,303 enrollees. As of June 30, 2015, the Storm Water Construction Program had 6,901 active enrollees. Due to the reduction in construction activities in California, the number of facilities, or construction projects, enrolling in the program is significantly lower than it was in FY 08-09 (with 17,123 active enrollees); however, the number of active facilities has increased from FY 13-14 to FY 14-15.

WHY THIS MEASURE IS IMPORTANT

The Construction Storm Water Program is unique in that the industrial activity (e.g., construction or land disturbance) is temporary in nature. The Construction Storm Water Program is highly dynamic, receiving many new applications under the construction general order (2009-0009-DWQ, as amended by 2010-0014-DWQ and 2012-0006-DWQ) every year. As construction activities begin, construction projects must enroll under the general order, and when construction activities are completed, enrollees must submit a notice of termination. Due to the high turnover of construction projects, the processing of all new applications and permit rescissions represent a significant portion of the program's workload.

TECHNICAL CONSIDERATIONS

GLOSSARY

Construction Stormwater Program
Dischargers whose projects disturb 1 or more acres of soil or are part of a larger common plan of development that in total disturbs 1 or more acres, are required to obtain coverage under the General Permit for Discharges of Storm Water Associated with Construction Activity (Construction General Permit, 2009-0009-DWQ).

General Permit
An NPDES permit issued under 40 CFR 122.28 that authorizes a category of discharges within a geographical area. A general permit is not specifically tailored for an individual discharger..

National Pollutant Discharge Elimination System (NPDES)
The NPDES permit program (Section 402 of the Clean Water Act) controls water pollution by regulating point sources that discharge pollutants into waters of the United States. Point sources are discrete conveyances such as pipes or man-made ditches. Individual homes that are connected to a municipal system, use a septic system, or do not have a surface discharge do not need an NPDES permit; however, industrial, municipal, and other facilities must obtain permits if their discharges go directly to surface waters. US EPA has approved the Water Board�s program to issue NPDES permits.

( Page last updated:  10/12/15 )

 
 

.