The California Water Boards' Annual Performance Report - Fiscal Year 2014-15
REGULATE: WASTE DISCHARGES TO LAND - WDR |
|
GROUP: |
ALL OTHER WASTE WASTE DISCHARGE TO LAND-WDR FACILITIES |
|
MEASURE: |
NUMBER OF PERMITS ADOPTED OR RENEWED
NUMBER OF PERMITS PAST RENEWAL DATE AS OF END OF FISCAL YEAR 2014-15
|
|
|
|
MEASUREMENTS
|
FusionCharts will load here
|
FusionCharts will load here
WHAT THE MEASURE IS SHOWING
WHY THIS MEASURE IS IMPORTANT
TECHNICAL CONSIDERATIONS
GLOSSARY
- All Other Facilities
- All facilities that treat and/or dispose of wastes that do not fall into one of the Municipal, Industrial and Agricultural Waste categories. It does not include Dairies or other Confined Animal facilities
- Waste Discharge Requirements Program
- The Waste Discharge Requirements (WDR) Program regulates all point source discharges of waste to land that do not require full containment (which falls under the Land Discharge Program), or are not subject to the NPDES Program.
- Review/Update Actions
- The Waste Discharge Requirements WDRs are to be reviewed according to a schedule based upon their TTWQ Category as follows: TTWQ 1= Every 5 years, TTWQ 2= Every 10 years and TTWQ 3= Every 15 years. TTWQ 1 has the highest priority. There are three possible actions which may result from the WDR review/update process: rescission, continuance, or revision. A revision requires the issuance of a new WDR with a new adoption date. No formal Regional Board action is required to continue WDRs without change. A memorandum signed by the Regional Board Executive Officer (EO), documenting that the review concluded that the existing WDR is appropriate and that no changes are necessary at this time, is placed in the WDR file.