The California Water Boards' Annual Performance Report - Fiscal Year 2015-16
State Board | Region 1 | Region 2 | Region 3 | Region 4 | Region 5 | Region 6 | Region 7 | Region 8 | Region 9
TARGETS AND RESOURCES: REGION 8 - SANTA ANA |
![]() |
GROUP: TARGETS AND RESOURCES - REGION 8 |
MEASURE: ALL REGIONAL TARGETS ALL RESOURCES |
Targets Achieved: |
Santa Ana Regional Water Board Performance Summary1 | Percentage of Targets Met |
||
Area: 2798 square miles | Budget: $8,746,291 | Staff: 62.8 | |
Permitting 40% • | Inspections 78% • | Others 38% • | |
1Regional Board performance summary statistics show the percentage of targets met. |
Total Maximum Daily Load and Basin Planning | |||||
Program Budget: $1,278,718 | Program Staff: 9.00 | ||||
Target | Actual Achieved | % of Targets Met | |||
Pollutant/Water Body Combinations Addressed | 11 | 0 | 0% • | ||
Total Maximum Daily Loads Adopted | 2 | 0 | 0% • | ||
Basin Plan Amendments Adopted | 2 | 1 | 50% • | ||
Pollutant/Water Body Combination Addressed target: Board staff had planned to conduct a separate Regional Board action to delist 6 waterbody/pollutant combinations. Once it was determined that these delistings could be addressed through the accelerated 2014/2016 Integrated Report cycle, effort was shifted to writing the decisions necessary for these delistings. Anticipated Regional Board delisting action is April 2017. | |||||
NPDES Wastewater | |||||
Program Budget: $1,087,727 | Program Staff: 7.70 | ||||
Target | Actual Achieved | % of Targets Met | |||
Major Individual Permits Issued or Renewed | 5 | 5 | 100% • | ||
Major Individual Facilities Inspected | 17 | 20 | 118% • | ||
Minor Individual Permits Issued or Renewed | 1 | 1 | 100% • | ||
Minor Individual Facilities Inspected | 4 | 8 | 200% • | ||
Minor General Facilities Inspected | 0 | 0 | |||
No Regional Board Considerations Provided | |||||
NPDES Stormwater | |||||
Program Budget: $1,415,628 | Program Staff: 10.90 | ||||
Target | Actual Achieved | % of Targets Met | |||
Municipal (Phase I/II Inspections) | 6 | 33 | 550% • | ||
Construction Inspections | 365 | 714 | 196% • | ||
Industrial Inspections | 300 | 329 | 110% • | ||
No Regional Board Considerations Provided | |||||
Waste Discharge to Land - Wastewater | |||||
Program Budget: $366,514 | Program Staff: 2.90 | ||||
Target | Actual Achieved | % of Targets Met | |||
Waste Discharge to Land Inspections | 21 | 24 | 114% • | ||
Individual Waste Discharge Requirements Updated | 11 | 0 | 0% • | ||
Region 8 Wastewater Unit has 5 line staff available to perform permitting, inspection and enforcement activities at NPDES and WDR permitted facilities. Fiscal year 2015-2016 performance targets for both programs were developed based on 10.6 PYs. Despite this discrepancy, the unit achieved 100 % of its targets in renewing major and minor individual NPDES permits and exceeded NPDES and WDR inspection targets. Significant staff time was re-directed to other regional board priorities that took away from achieving the WDR permitting targets including issuance of eight individual exemptions for onsite wastewater treatment systems (OWTS) that did not meet the conditions of the General Waiver (Order No. R8 2013-0015) and the initial review of the Local Area Management Plans for the counties of San Bernardino and Riverside pursuant to the statewide OWTS policy. | |||||
Land Disposal | |||||
Program Budget: $592,469 | Program Staff: 4.00 | ||||
Target | Actual Achieved | % of Targets Met | |||
Landfill Individual Permits Updated | 2 | 1 | 50% • | ||
Landfill Inspections | 50 | 32 | 64% • | ||
All Other Individual Permits Updated | 1 | 0 | 0% • | ||
All Other Inspections | 23 | 14 | 61% • | ||
No Regional Board Considerations Provided | |||||
Confined Animal Facilities (WDR, NPDES, etc.) | |||||
Program Budget: $0 | Program Staff: 0.00 | ||||
Target | Actual Achieved | % of Targets Met | |||
Confined Animal Facilities (WDR, NPDES, etc.) | 70 | 112 | 160% • | ||
No Regional Board Considerations Provided | |||||
Timber Harvest (Forestry) | |||||
Program Budget: $0 | Program Staff: 0.00 | ||||
Target | Actual Achieved | % of Targets Met | |||
Timber Harvest Inspections | 0 | 0 | |||
No Regional Board Considerations Provided | |||||
Enforcement | |||||
Program Budget: $217,490 | Program Staff: 1.40 | ||||
Target | Actual Achieved | % of Targets Met | |||
Class 1 Priority Violations will Result in Formal Enforcement or an Investigative Order Pursuant to Water Code Section 13267 within 18 Months of Discovery | 100% | 50% | 50% • | ||
No Regional Board Considerations Provided | |||||
Cleanup | |||||
Program Budget: $570,105 | Program Staff: 3.70 | ||||
Target | Actual Achieved | % of Targets Met | |||
New Department of Defense Sites Into Active Remediation | 1 | 2 | 200% • | ||
New Cleanup Moved Sites Into Active Remediation | 6 | 5 | 83% • | ||
Cleanup Sites Closed | 5 | 5 | 100% • | ||
New Underground Storage Tank Sites Into Active Remediation | 0 | 6 | |||
Underground Storage Tank Sites Projected Closed | 30 | 20 | 67% • | ||
No Regional Board Considerations Provided | |||||
RESOURCES (INPUTS)
Region 8 (Santa Ana) | FY 2015-16
Budget ($) |
Staff (PY) | %Fees/Taxes Penalties |
%Federal | %General Fund/Other |
%Bonds |
---|---|---|---|---|---|---|
Planning | $1,278,718 | 9.0 | - | - | - | - |
Basin Planning | $228,689 | 1.5 | 100% | 0% | 0% | 0% |
Total Maximum Daily Load | $1,050,029 | 7.5 | 67% | 33% | 0% | 0% |
Monitoring | $62,166 | 0.9 | - | - | - | - |
Water Quality Monitoring (SWAMP/GAMA) | $62,166 | 0.9 | 100% | 0% | 0% | 0% |
Regulate | $4,288,893 | 32.1 | - | - | - | - |
401 Certification/Wetlands | $225,709 | 2.2 | 100% | 0% | 0% | 0% |
Confined Animal Facilities | $0 | 0.0 | 0% | 0% | 0% | 0% |
Department of Defense/Navy Cost Recovery | $241,929 | 1.7 | 100% | 0% | 0% | 0% |
Enforcement Coordination | $217,490 | 1.4 | 100% | 0% | 0% | 0% |
Forest Activities/Timber Harvest Plans | $0 | 0.0 | 0% | 0% | 0% | 0% |
Irrigated Lands | $0 | 0.0 | 0% | 0% | 0% | 0% |
Land Disposal/Landfills | $592,469 | 4.0 | 100% | 0% | 0% | 0% |
Nonpoint Source | $141,427 | 1.3 | 0% | 100% | 0% | 0% |
NPDES | $1,087,727 | 7.7 | 100% | 0% | 0% | 0% |
Other Programs (miscellaneous programs not included in the above) | $0 | 0.0 | 0% | 0% | 0% | 0% |
Stormwater | $1,415,628 | 10.9 | 100% | 0% | 0% | 0% |
Waste Discharge to Land | $366,514 | 2.9 | 100% | 0% | 0% | 0% |
Watershed Initiative | $0 | 0.0 | 0% | 0% | 0% | 0% |
Clean Up | $1,324,862 | 9.7 | - | - | - | - |
Spills, Leaks, Investigations and Cleanup | $570,105 | 3.7 | 68% | 0% | 32% | 0% |
Underground Storage Tanks | $754,757 | 6.0 | 64% | 27% | 9% | 0% |
Fund | $216,701 | 1.7 | - | - | - | - |
Bond Programs (State Operations/Staff) | $0 | 0.0 | 0% | 0% | 0% | 0% |
Clean Up and Abatement Account | $47,949 | 0.5 | 100% | 0% | 0% | 0% |
Underground Storage Tank Claim Payments | $168,752 | 1.2 | 100% | 0% | 0% | 0% |
Administration | $79,812 | 0.0 | - | - | - | - |
Operating Expenses and Equipment (includes Facility Operations) | $79,812 | 0.0 | 0% | 0% | 100% | 0% |
Management and Support | $1,495,139 | 9.4 | - | - | - | - |
Management/Administration | $1,495,139 | 9.4 | 0% | 0% | 100% | 0% |
Santa Ana Total | $8,746,291 | 62.8 | - | - | - | - |
WHAT THE CARD IS SHOWING
Each target card provides a direct comparison of actual outputs for the fiscal year (July 1st to June 30th) to the target estimates established at the outset of the fiscal year. While budgetary and personnel information is not directly aligned with the activities being assessed, it does provide a basis for understanding the relative priority of key programs within each region and across the State. For the actual outputs presented, the Water Boards are continuing to evolve its data bases for improved accuracy. Some of the measurements reported may be different than the measurements tracked by the regions and programs. In addition, there are several targets for which outputs cannot be readily displayed without modification to the databases. This includes the number of permits revised, which should include the number of permits reviewed, revised and/or rescinded.
For the actual outputs presented, the Water Boards are continuing to evolve its data bases for improved accuracy. Some of the measurements reported may be different than the measurements tracked by the regions and programs. Notably, the data portrayed include entries completed before November 4, 2014 and may not reflect data input after that period.
WHY THIS CARD IS IMPORTANT
Beginning with FY 2009-10, performance targets were established for certain output measures. Targets are goals that establish measurable levels of performance to be achieved within a specified time period. This card demonstrates how the resources of the region are being deployed to protect water quality. In establishing the targets, the Regional Water Boards considered the unique differences and needs within their respective watersheds, their work priorities given available resources, external factors such as furloughs, and prior year outputs.
TECHNICAL CONSIDERATIONS
- Target circles: • = Less than 60% of target met
• = Target met between 60% and 80%
• = Target met at 80% or above. - Other Programs (budget): miscellaneous programs not included in the above.
- Permits issued: Does not include rescissions, amendments or permit revisions that may have been included in the targets.
REGIONAL CONSIDERATIONS
Regional Considerations provided in tables above under each program section.