The California Water Boards' Annual Performance Report - Fiscal Year 2016-17
REGULATE: WASTE DISCHARGES TO LAND - WDR
GROUP:
ALL OTHER WASTE WASTE DISCHARGE TO LAND-WDR FACILITIES
MEASURE:
NUMBER OF PERMITS ADOPTED OR RENEWED
NUMBER OF PERMITS PAST RENEWAL DATE AS OF END OF FISCAL YEAR 2016-17
MESSAGE:
39 percent of permits are current.
Key Statistics for FY 2016-17
Number of Active Facilities
395
Number of Permits Renewed
16
Number of Permits Past Renewal Date
240
MEASUREMENTS - Data Last Updated on: 04-09-2018 (3:09 pm)
Region
Active Number of Facilities
Permits Issued / Renewed During FY 16-17
Permits Past Renewal Date as of June 30, 2016
Percentage Facilities With Current Permits
1
16
0
8
50%
2
12
0
11
8%
3
39
2
22
44%
4
31
1
16
48%
5
219
10
140
36%
6
47
1
32
32%
7
13
1
0
100%
8
3
0
2
33%
9
15
1
9
40%
TOTAL
395
16
240
39%
WHAT THE MEASURE IS SHOWING
Facilities under the "all other" category include food processing plants and all other non-industrial and non-municipal domestic type of waste. As of the end of Fiscal Year (FY) 2016-17, 39 percent of permits for these facilities are current, while the remaining 240 were past their expiration/review date (i.e., not updated) as of June 30, 2017 and may be considered backlogged. The permit backlog remains to be addressed and may represent an additional workload for FY 2017-18. The permit backlog varies among the Regional Water Boards.
WHY THIS MEASURE IS IMPORTANT
WDRs are issued for the duration of the discharge and do not contain an expiration date. Regional Water Boards are authorized to review WDRs periodically pursuant to Section 13263(e) of the Porter-Cologne Water Quality Control Act. The State Legislature has found that many WDRs are out of date and therefore do not reflect existing laws, regulations, and revised Water Quality Control Plans. The Water Boards recommend that WDRs be reviewed on a frequency of five, ten, or fifteen years, based on the dischargers Threat to Water Quality (TTWQ). WDRs that have not been reviewed/updated are considered to be backlogged. This measure describes the workload associated with existing requirements.
TECHNICAL CONSIDERATIONS
Data Source: CIWQS. Period July 1, 2016 to June 30, 2017.
Unit of Measure: Number of active all other facilities regulated under an individual or general WDR during FY 16-17.
Data Definitions:Permits updated during FY 15-16: Review/adoption date between July 1, 2016 and June 30, 2017. Permits Current: Permits not expired and not adopted/updated in FY 16-17. Permits Expired: Permits with an expiration date before June 30, 2017.
All facilities that treat and/or dispose of wastes that do not fall into one of the Municipal, Industrial and Agricultural Waste categories. It does not include Dairies or other Confined Animal facilities.
Waste Discharge Requirements Program
The Waste Discharge Requirements (WDR) Program regulates all point source discharges of waste to land that do not require full containment (which falls under the Land Discharge Program), or are not subject to the NPDES Program.
Review/Update Actions
The Waste Discharge Requirements WDRs are to be reviewed according to a schedule based upon their TTWQ Category as follows: TTWQ 1= Every 5 years, TTWQ 2= Every 10 years and TTWQ 3= Every 15 years. TTWQ 1 has the highest priority. There are three possible actions which may result from the WDR review/update process: rescission, continuance, or revision. A revision requires the issuance of a new WDR with a new adoption date. No formal Regional Board action is required to continue WDRs without change. A memorandum signed by the Regional Board Executive Officer (EO), documenting that the review concluded that the existing WDR is appropriate and that no changes are necessary at this time, is placed in the WDR file.