Lower San Gabriel River
- Approval of the Lower San Gabriel River CIMP (April 8, 2026)
- Approval Confirmation of Lower San Gabriel River WMP (November 14, 2024)
- Conditional Approval of the Lower San Gabriel River WMP (May 1, 2023)
Contacts
Program Supervisor:
Erum Razzak
(213) 620-2095
Senior Environmental Scientist (Supervisor)
-
Staff
Harumi Goya
(213) 620-2283
Engineering GeologistFarzad Kasmaei
(213) 576-6695
Water Resource Control EngineerJessica Pearson
(213) 576-6786
Water Resource Control EngineerAlireza Rahmani
(213) 576-6692
Water Resource Control EngineerAngineh Shahnazarian
(213) 576-6635
Environmental Scientist


