MRP Model Bioretention Soil Media Specifications
Provision C.3.c.iii.(3) of the Municipal Regional Stormwater Permit (MRP) requires the Permittees, collaboratively or individually, to submit a report containing the following information:
- Proposed soil media specifications for biotreatment systems
- Proposed soil testing methods to verify a long-term infiltration rate of 5-10 inches/hour
- Relevant literature and field data showing the feasibility of the minimum design specifications
- Relevant literature, field, and analytical data showing adequate pollutant removal and compliance with the Provision C.3.d hydraulic sizing criteria
- Guidance for the Permittees to apply the minimum specifications in a consistent and appropriate manner
The Report can be obtained at the following link:
Comments on the Municipal Regional Permit (MRP) Bioretention Soil Specs received by January 28, 2011
- Roger James
- Natural Resources Defense Council