California Water Boards' Annual Performance Report - Fiscal Year 2017-18
REGULATE: WASTE DISCHARGES TO LAND - WDR
INDUSTRIAL WASTE WDR FACILITIES
NUMBER OF PERMITS ADOPTED OR RENEWED
NUMBER OF PERMITS PAST RENEWAL DATE AS OF END OF FISCAL YEAR 2017-18
34 percent of permits for industrial facilities regulated by the WDR Program are current.
Key Statistics for FY 2017-18 | |
---|---|
Number of Active Facilities | 403 |
Number of Permits Renewed | 18 |
Number of Permits Past Renewal Date | 266 |
MEASUREMENTS - Data Last Updated on: 11-16-2018 (4:24 pm)
Region | Active Number of Facilities | Permits Issued / Renewed During FY 17-18 | Permits Past Renewal Date as of June 30, 2018 | Percentage Facilities With Current Permits |
---|---|---|---|---|
1 | 43 | 1 | 40 | 7% |
2 | 11 | 1 | 9 | 18% |
3 | 28 | 1 | 24 | 14% |
4 | 4 | 0 | 1 | 75% |
5 | 277 | 15 | 177 | 36% |
6 | 8 | 0 | 4 | 50% |
7 | 24 | 0 | 6 | 75% |
8 | 1 | 0 | 0 | 100% |
9 | 7 | 0 | 5 | 29% |
TOTAL | 403 | 18 | 266 | 34% |
WHAT THE MEASURE IS SHOWING
As of the end of Fiscal Year (FY) 2017-18, 34 percent of permits for industrial facilities are current, while the remaining 266 permits for industrial facilities were past their expiration/review date (i.e., not updated) as of June 30, 2018 and may be considered backlog. The permit backlog remains to be addressed and may represent an additional workload for FY 2018-19. The permit backlog varies among the Regional Water Boards.
WHY THIS MEASURE IS IMPORTANT
WDRs are issued for the duration of the discharge and do not contain an expiration date. Regional Water Boards are authorized to review WDRs periodically pursuant to Section 13263(e) of the Porter-Cologne Water Quality Control Act. The State Legislature has found that many WDRs are out of date and therefore do not reflect existing laws, regulations, and revised Water Quality Control Plans. The Water Boards recommend that WDRs be reviewed on a frequency of five, ten, or fifteen years, based on the dischargers Threat to Water Quality (TTWQ). WDRs that have not been reviewed/updated are considered to be backlogged. This measure describes the workload associated with existing requirements.
TECHNICAL CONSIDERATIONS
- Data Source: CIWQS. Period July 1, 2017 to June 30, 2018.
- Unit of Measure: Number of active industrial facilities regulated under an individual or general WDR during FY 17-18.
- Data Definitions: Permits updated during FY 17-18: Review/adoption date between July 1, 2014 and June 30, 2018. Permits Current: Permits not expired and not adopted/updated in FY 17-18. Permits Expired: Permits with an expiration date before June 30, 2018.
- References: Information on the Water Boards' WDR - NON15 program
Public Reports and Data
Enforcement and Compliance Assurance Information
GLOSSARY
- Industrial Sources
- Facilities that treat and/or dispose of liquid or semisolid wastes from any servicing, producing, manufacturing or processing operations of whatever nature including mining, gravel washing, geothermal operations, air conditioning, ship building and repairing, oil production, storage and disposal operations, and water well pumping.
- Waste Discharge Requirements Program
- The Waste Discharge Requirements (WDR) Program regulates all point source discharges of waste to land that do not require full containment (which falls under the Land Discharge Program), or are not subject to the NPDES Program.
- Review/Update Actions
- The Waste Discharge Requirements WDRs are to be reviewed according to a schedule based upon their TTWQ Category as follows: TTWQ 1= Every 5 years, TTWQ 2= Every 10 years and TTWQ 3= Every 15 years. TTWQ 1 has the highest priority. There are three possible actions which may result from the WDR review/update process: rescission, continuance, or revision. A revision requires the issuance of a new WDR with a new adoption date. No formal Regional Board action is required to continue WDRs without change. A memorandum signed by the Regional Board Executive Officer (EO), documenting that the review concluded that the existing WDR is appropriate and that no changes are necessary at this time, is placed in the WDR file.