Underground Storage Tank (UST) Program
ENHANCED VAPOR RECOVERY SYSTEMS - DETERMINATION LETTERS
A provision of Assembly Bill (AB) 2955 (Statutes 2004, Chapter 649) requires the Air Resources Board (ARB) and State Water Resources Control Board (State Water Board) to determine collaboratively, to the best of their knowledge and using existing resources, that the equipment that meets the ARB’s Enhanced Vapor Recovery (EVR) requirements also meets underground storage tank (UST) statutory requirements. [Health and Safety Code (HSC), chapter 6.7, section 25290.1.2(a).] Below is a list of systems that have gone through the Multi Agency Review Process. The State Water Board found no evidence that these systems conflict with H&SC Chapter 6.7 section 25290.1.2(a).
Phase I Enhanced Vapor Recovery (EVR) Systems
Executive Order |
Title of EVR System |
Current EVR Determination Letter |
Previously Issued EVR Determination Letters |
VR-101 |
Phil-Tite Phase I EVR System |
Compilation of all previously issued EVR determination letters for Phil‑Tite and EBW phase I EVR systems and the addition of the Defender Series overfill prevention valve (3/21/2016) |
Modification to the Frank Fueling Systems Defender Overfill Prevention Valve (2/25/2020)
Modification to the Franklin Fueling Systems Defender 804 Vent Cap (12/17/2019)
Addition of Defender Series spill containment to the Phil-Tite and EBW EVR phase I systems (5/13/2013)
Addition of E-85 fuel compatibility to the Phil-Tite EVR phase I system (6/26/2008)
Addition of the Husky Corp. Model 5885 Pressure/Vacuum vent valve (1/28/2008)
Addition of the Beaudreau Electric Inc. BEI PV-Zero vent valve (1/28/2008)
Addition of the EBW Auto Limiter II overfill prevention valve drop tube and other EBW EVR components to the Phil-Tite EVR phase I system (11/13/2006)
Addition of 85000-1 Series spill container to the Phil-Tite EVR phase I system (6/30/2005)
|
VR-102 |
OPW Phase I EVR System |
OPW Phase I EVR System Compilation of all previously issued EVR determination letters for the OPW Fueling Containment Systems Phase I EVR System and the addition of the Defender Series and EBW fill components (7/18/2019) |
OPW Phase I EVR Addition of the Fibrelite Multiport Configuration and revisions of the equipment list (5/10/2016)
The addition of the OPW 1-2200 series spill containment and factory/field installed drain plug for the fill side of 1 series spill containment (8/26/2014)
Addition of the OPW 61JSK alternate remote fill configuration (9/6/2013)
Addition of the OPW 1-3700 Series spill container to retrofit existing 500L and 700L Series spill containers (4/16/2013)
Addition of the OPW 71SO-4XXCT Series overfill prevention valve (4/16/2013)
Addition of the OPW 1-3100 Series spill container (1/5/2009)
Addition of the Beaudreau Electric Inc. BEI PV-Zero vent valve (1/28/2008)
Addition of the OPW 71SO overfill prevention valve, the OPW 61JSK-4RMT remote fill configuration, and minor modifications of several existing components (4/10/2007)
Modifications to the OPW 1-2100 Series and Pomeco 500 Series spill containers and OPW 53 VML overfill prevention valve (8/31/2005)
|
VR-103 |
EBW Phase I EVR System |
See State Water Resources Control Board’s Determination Letter for VR-101 |
VR-104 |
CNI Manufacturing Phase I EVR System |
See Previously Issued EVR Determination Letters |
Addition of the Husky Corp. Model 5885 Pressure/Vacuum vent valve (1/28/2008)
Addition of the Beaudreau Electric Inc. BEI PV-Zero vent valve (1/28/2008)
Addition of the Emco Wheaton Retail overfill prevention valve and swivel adaptor (8/10/2007)
Addition of the CNI Manufacturing 205 and 215 Models Stand-Alone/Direct Bury configuration spill container (9/14/2005)
|
VR-105 |
Emco Wheaton Retail Phase I EVR System |
Compilation of all previously issued EVR determination letters for the Emco Wheaton Retail Phase I EVR System (7/16/2014) |
Addition of EMCO riser extension, tank fill debris collector, 0585 ATG probe cap, and bar style extractor cap (01/23/2025)
Modifications to the EMCO collar kits, fill and vapor adapter, pull style drain valve, riser seal, spill container lid, plow ring, and overfill prevention valves (01/23/2025)
Addition of the Remote Fill and Auxiliary Tank Gauge Stick Port (3/30/2023)
Addition of the A1005 Aboveground Spill Container (3/30/3023)
Modification to the EMCO Model A1004EVR Series spill containment (3/27/2014)
Addition of the Emco Wheaton Retail A0020EVR Series drop tube and modifications to the A1004EVR Series spill container (11/17/2010)
Addition of the Husky Corp. Model 5885 Pressure/Vacuum vent valve (1/28/2008)
Addition of the Beaudreau Electric Inc. BEI PV-Zero vent valve (1/28/2008)
Addition of the Emco Wheaton Retail EVR phase I system (8/8/2006)
|
Phase II Enhanced Vapor Recovery Systems
Historical Enhanced Vapor Recovery Determination Letters
Manufacturer |
Model |
Applicability |
Description of Operation |
Date of Letter |
OPW Fueling Components, Inc. |
Vaporsaver ORVR-Compatible |
Modification to EVR, Phase II System |
Change of fan material from plastic to aluminum, addition of a fan support bracket, and the use of cast aluminum for select components in place of machined aluminum.
(E.O G-70-204.) |
11/3/2005 |
»» For more information regarding UST vapor recovery program, visit the Air Resources Board's Vapor Recovery Website.