Dutra Haystack Asphalt Plant Project
Introduction
This page pertains to the Dutra Haystack Asphalt Plant Project (Project) being proposed by San Rafael Rock Quarry, Inc., DBA Dutra Materials. The proposed Project would construct an asphalt plant facility and associated conveying system on the approximately 35-acre Haystack Landing site, located at 3355 Petaluma Boulevard South. The proposed Project would construct an asphalt plant facility and associated conveying system on the approximately 35-acre Haystack Landing site, located at 3355 Petaluma Boulevard South. The facility would take delivery of aggregate and sand from the existing Landing Way barge offload facility, owned by Shamrock Materials, Inc. and located at 210 Landing Way. The aggregate material would be transferred by an enclosed electric conveyor on the Landing Way property, over the Barton property to the south, across the Sonoma Marin Area Rail Transit right-of-way, to the Haystack Landing site to the west.. The Water Board issued water quality certification for the project to the Corps in March, 2016, and intends to consider waste discharge requirements for the project before construction begins in the fall of 2016. If you have any questions, please contact Xavier Fernandez at 510-622-5685 or email at xavier.fernandez@waterboards.ca.gov.2015 Application
- Water Quality Certification Application
- Grading Plans
- Wetlands Mitigation and Monitoring Plan
- Miller Pacific Water Holding Capacity Memorandum
- Post-Construction Storm Water Management Plan
- Post-Construction Storm Water Operations and Maintenance Plan
- Storm Water Pollution Prevention Plan
- Spill Prevention, Control, and Countermeasure Plan
- County Conditions of Approval
Public Comments on 2015 Application
- Public Notice of Water Quality Certification Application
- Private Citizen Comments on Water Quality Certification Application
- Non-Governmental Organization Comments on Water Quality Certification
- City of Petaluma Comments in Response to First Public Notice
2017 Alternatives Analysis
- Alternatives Analysis 10/2017 SFBRWQCB Cover letter
- Alternatives Analysis 10/2017 USACE Cover letter
- Alternatives Analysis 10/2017
- Management Plan 10/2017
- Wetland Mitigation and Monitoring Plan October 2017
2016 Alternatives Analysis
- Alternatives Analysis 10/2017 SFBRWQCB Cover letter
- Alternatives Analysis 10/2017 USACE Cover letter
- Alternatives Analysis 10/2017
- Management Plan 10/2017
- Wetland Mitigation and Monitoring Plan October 2017
- Dutra Alternatives Analysis 10/13/2016
Public Comments on 2016 Alternatives Analysis
- Public Notice of Alternatives Analysis
- Private Citizen Comments on Alternatives Analysis
- Non-Governmental Organization Comments on Alternatives Analysis