Issue Date: November 14, 1997
Revision Date: January 11, 2001

Andover Controls Corp.

Andover Infinity Versions CX9900, CX9400, CX9200, CX9000, CMX240
(Magnetostrictive Probe)

Automatic Tank Gauging Method

Certification Leak rate of 0.2 gph with PD = 95.4% and PFA = 4.6%.
Leak Threshold 0.1 gph.
A tank system should not be declared tight if the test result indicates a loss or gain that equals or exceeds this threshold.
Applicability Gasoline, diesel, aviation fuel, fuel oil #4.
Other liquids with known coefficients of expansion and density may be tested after consultation with the manufacturer.
Tank Capacity Maximum of 30,000 gallons.
Tank must be between 50 and 95% full.
Waiting Time Minimum of 6 hours between delivery and testing.
Minimum of 3 hours between dispensing and testing.
There must be no delivery during waiting time.
Test Period Minimum of 6 hours.
Test data are acquired and recorded by system's computer.
Leak rate is calculated as the average of subsets of all data collected.
There must be no dispensing or delivery during test.
Temperature Average for product is determined by a minimum of 3 resistance temperature detectors (RTDs).
Water Sensor Must be used to detect water ingress.
Minimum detectable water level in the tank is 0.35 inch.
Minimum detectable change in water level is 0.0028 inch.
Calibration RTDs and probe must be checked and, if necessary, calibrated in accordance with manufacturer's instructions.
Comments

Not evaluated using manifolded tank systems. Therefore, this certification is only applicable when there is a probe used in each tank and the siphon is broken during testing.
Tests only portion of tank containing product.
As product level is lowered, leak rate in a leaking tank decreases (due to lower head pressure).
Consistent testing at low levels could allow a leak to remain undetected.
EPA leak detection regulations require testing of the portion of the tank system which routinely contains product.

California regulations require at least one test per month after routine product delivery or when the tank is filled to within 10% of the highest operating level of previous month.

  • Andover Controls Corp.
    300 Brickstone Square
    Andover, MA 01810
    Tel: (978) 470-0555
  • Evaluator: Ken Wilcox Associates
    Tel: (816) 443-2494
    Date of Evaluation: 01/20/97

Home |  Vendors: A–F |  Vendors: G–M |  Vendors: N–S |  Vendors: T–Z |  Method Index

Appearance on this list is not to be construed as an endorsement by any regulatory agency nor is it any guarantee of the performance of the method or equipment. Equipment should be installed and operated in accordance with all applicable laws and regulations. For full details, please refer to our expanded DISCLAIMER page.