Issue Date: March 13, 2017
FAFNIR
Xerxes VISY-X Systems
Volumetric Tank Tightness Test Method (Underfill)
Certification | Leak rate of 0.1 gph with PD = 97.95% and PFA = 2.05%. |
---|---|
Leak Threshold | 0.05 gph. A tank system should not be declared tight if the test result indicates a loss or gain that equals or exceeds this threshold. |
Applicability | Gasoline, diesel, aviation fuel, fuel oil #4, solvents. All chemicals compatible with sensors. |
Tank Capacity | Maximum of 20,000 gallons. Tank must be minimum 90% full. |
Waiting Time | Minimum of 8 hours between delivery and testing. No wait time between "topping off" and testing. |
Test Period | Minimum of 4 hour. Testing is conducted at night. Total time needed to test, waiting time plus testing time, is 12 hours. Test data are acquired and recorded by system's computer. |
Temperature | Temperature of added product should not differ more than +7oF from existing product temperature. |
Groundwater | Depth to groundwater in tank excavation backfill must be determined. If groundwater is above bottom of tank, product level must be adjusted to provide net pressure of at least one (1) psi outward differential pressure at bottom of tank. |
Comments | Not evaluated using manifolded tank systems. |
- FAFNIR GmbH
Schnackenburgallee 149 c
22525 Hamburg, Germany
Tel: +49/40/398207 - 0
E-mail: info@fafnir.de
URL: www.fafnir.com - Evaluator: Ken Wilcox Associates, Inc.
1125 Valley Ridge Dr.
Grain Valley, MO 64029
Tel: (816) 443-2494
Date of Evaluation: 10/29/2009
Home | Vendors: A–F | Vendors: G–M | Vendors: N–S | Vendors: T–Z | Method Index
Appearance on this list is not to be construed as an endorsement by any regulatory agency nor is it any guarantee of the performance of the method or equipment. Equipment should be installed and operated in accordance with all applicable laws and regulations. For full details, please refer to our expanded DISCLAIMER page.