El Niño Storm Preparedness Emergency Permitting
On September 21, 2026, California Governor Gavin Newsom signed a Proclamation of a State of Emergency that allows expedited permitting of flood mitigation projects to prepare for the potential extreme weather and flooding effects of this year’s intensified El Niño conditions.
The California Water Boards, which include the State Water Resources Control Board and the nine Regional Water Quality Control Boards, are working closely together to prepare for issues that may occur during the fall and winter.
To prepare for this year’s El Niño event, local governments, special districts, and other entities may identify a need to conduct emergency dredge or fill projects impacting local waterways to prevent potential flooding and other weather impacts.
Culvert Maintenance
To protect roads, property, and water quality, it is essential to conduct routine maintenance on existing culverts, which are structures that allow water to flow under a road, railway or path.
There are no Water Boards fees, permits, or notifications for the following routine culvert maintenance activities when no flowing water is present in the culvert:
- Removal of accumulated bedload materials (e.g., sand, silt, gravel, cobble, boulders) within the culvert including at the inlet and outlet.
- Removal of accumulated leafy and woody materials that impede or prevent flow through the culvert. This includes materials that partially, completely, or have the potential to block the culvert inlet, outlet, or within the culvert itself.
- Routine maintenance activities can be conducted with hand tools or mechanized equipment.
- If mechanized heavy equipment is used, exposed soils shall be stabilized at completion of work to minimize potential discharges of sediment to waters of the state.
- Removed material (bedload, leaves, and woody material), must be relocated to a stable upland area where it cannot return to the stream or adjacent wetlands or other water bodies.
Flood Control Channel Dredge or Fill Permitting Options
Other flood control projects do require a permit from the appropriate Regional Water Board, but through the State of Emergency, the following emergency permits are immediately available for flood mitigation activities, in coordination with the applicable Regional Water Board:
- Emergency WDR for Dredge or Fill Discharges to Waters of the State.
- General WDR for Disaster Related Wastes.
- Regional General Permit (RGP) 5 for Emergency Repair and Protection Activities – Requires Army Corps 404 permit.
- RGP 8 for Emergency Repair and Protection Activities – Requires Army Corps 404 permit.
- RGP 63 for Emergency Repair and Protection Activities – Requires Army Corps 404 permit.
In the event your facility or operation does not fall within these permitting pathways, expedited review and approval under other permitting processes will be prioritized consistent with the State of Emergency Proclamation.
If you are unsure which Regional Water Board your project will fall under, please review the State and Regional Water Boards Map for more information. The Dredge or Fill Program Telephone Directory has contact information for each Regional Water Board.
Refilling Groundwater Aquifers with Stormwater or Floodwater
Diverting water from rivers during floods or other high flow events can help reduce flood risks as well as helping to store water underground for later use. There are several options available to divert flood water to aquifers.
More information can be found on the Preparing for a Wet Winter webpage.
Option A: Obtain a Temporary Water Right Permit for Underground Storage
A Groundwater Sustainability Agency (GSA), water district or other local water supply agency can secure a temporary permit to divert high water flows into groundwater storage for their own later use.
A temporary permit can cover either one rainy season (180 days) or up to 5 years.
Interested water diverters should apply:
- 4 months in advance if the applicant has completed the legally required California Environmental Quality Act (CEQA) process before filing the application or
- 12 months in advance, if the applicant will complete CEQA while the application is processed.
9 communities already have 5-year permits, giving them the authorization to divert stormwater during the 2026-2027 El Nino season.
Refer to the State Water Board’s Temporary Permits for Groundwater Recharge webpage and the Getting Ready to Recharge with a Permit video workshop on stormwater recharge permits for requirements
Option B: Divert During Declared Flood Emergencies
Following the State of Emergency Proclamation, on October 15, 2026, the Governor signed Executive Order N-14-26 to further support preparedness projects for the 2026- 2027 El Niño event. The Executive Order suspends the requirement for plans for flood control or flood risks prior to the diversion of flood flows.
To reduce the risk of flooding and ensure floodwaters have a beneficial use, anyone can divert floodwater during qualifying flood conditions without a water right permit to refill groundwater. Specific conditions, protections, and reporting requirements apply.
Find specifics on requirements, forms, and technical guidance to divert flood flows before a high-water event in:
Additional Resources:
State Water Board: State Water Board’s role in El Niño 2026-2027 state coordination
State Water Board: Permits for Groundwater Recharge and Temporary Permits for Groundwater Recharge and Flood Recharge Diversions
State Water Board: Construction Stormwater General Permit Site Preparation for Historic El Niño Event
State Water Board: Industrial General Permit Facility Preparation for Historic El Niño Event
State Water Board: Emergency Permitting for Discharges of Dredged or Fill Material
State Water Board: Disaster Related Wastes General Order
North Coast Regional Water Quality Control Board: 2026 Emergency Permitting
Handbook for Forest, Ranch & Rural Roads: A Guide For Planning, Designing, Constructing, Reconstructing, Upgrading, Maintaining And Closing Wildland Roads