Index of Electronically Available Supporting Documents for the March 9, 2009 Flow, Entrainment and Impingement Minimization Plan Submitted by Poseidon Resources Corporation
Date/Type |
From |
To |
Description |
8/16/2006 Permit |
San Diego Regional Water Quality Control Board |
|
Adopted Order No. R9-2006-0065, NPDES No. CA109223 |
2/12/2007 Report |
Poseidon Resources Corporation |
San Diego Regional Water Quality Control Board |
Flow, Entrainment and Impingement Minimization Plan (Draft)
Attachment 1 – Toxicity Testing Study Plan
Attachment 2 – Acute Toxicity Testing Study Results
Attachment 3 – Near Shore Saline Effects Due to Reduced Flow Rate Scenarios During Stand-Alone Operations of the Carlsbad Desalination Project at Encina Generating Station
Attachment 4 –Flow Minimization Alternatives, Through Screen Velocities & Long-Term West Basin Water Level Analysis for Assessing Threshold Impingement Effects of Reduced Intake Flows at Agua Hedionda Lagoon
Attachment 5 – Marine Biology Entrainment in Additional Responses to Comments of the Final EIR-03-05 for the Precise Development Plan and Desalination Plant Project
Attachment 6 – Coastal Process Effects of Reduced Intake Flows at Agua Hedionda Lagoon |
2/21/2007 Public Notice |
San Diego Regional Water Quality Control Board |
|
Notice of Availability-Flow, Entrainment, and Impingement Minimization Plan, Poseidon Resources Corporation |
4/9/2007 Letter |
Sierra Club, San Diego Chapter |
San Diego Regional Water Quality Control Board |
Comment Letter on Flow, Entrainment and Impingement Minimization Plan |
4/10/2007 Letter |
San Diego Coastkeeper |
San Diego Regional Water Quality Control Board |
Comment Letter on Flow, Entrainment and Impingement Minimization Plan |
5/2/2007 Letter |
California Coastal Commission |
San Diego Regional Water Quality Control Board |
Comment Letter on Flow, Entrainment and Impingement Minimization Plan |
6/29/2007 Report |
Poseidon Resources Corporation |
San Diego Regional Water Quality Control Board |
Revised Flow, Entrainment and Impingement Minimization Plan
Attachment 1 – Toxicity Testing Study Plan
Attachment 2 – Acute Toxicity Testing Study Results
Attachment 3 – Near Shore Saline Effects Due to Reduced Flow Rate Scenarios During Stand-Alone Operations of the Carlsbad Desalination Project at Encina Generating Station
Attachment 4 – Updated Impingement and Entrainment Assessment
Attachment 5 - Proposal for Information Collection Clean Water Act 316(b), Encina Power Station, Cabrillo Power I LLC, NPDES Permit No. CA0001350, April 1, 2006
Attachment 6 – Coastal Process Effects of Reduced Intake Flows at Agua Hedionda Lagoon
Attachment 7 - Long-Term West Basin Water Level Analysis for Assessing Threshold Impingement Effects of Reduced Intake Flows at Agua Hedionda Lagoon
Attachment 8 – Potential Adverse Changes in Agua Hedionda Lagoon Resulting from Abandonment of the Lagoon Intake
|
9/6/2007 Letter |
San Diego Regional Water Quality Control Board |
Poseidon Resources Corporation |
Review and deferral of determination of Flow, Entrainment and Impingement Plan |
9/10/2007 Letter |
Poseidon Resources Corporation |
San Diego Regional Water Quality Control Board |
Response to deferral of determination of Flow, Entrainment and Impingement Plan
|
9/20/2007 Letter |
San Diego Regional Water Quality Control Board |
Poseidon Resources Corporation |
|
2/19/2008 Letter |
San Diego Regional Water Quality Control Board |
Poseidon Resources Corporation |
|
3/7/2008 Report |
Poseidon Resources Corporation |
San Diego Regional Water Quality Control Board |
Revised Flow, Entrainment, and Impingement Minimization Plan
Attachment 1 - Cost Estimate of Subsurface Intake Alternatives
Attachment 2 - Impingement Results, G1 - Traveling Screens and Bar Racks Weekly Surveys, G2 - Heat Treatment Surveys
Attachment 3 - Proposal for Information Collection Clean Water Act 316(b), Encina Power Station, Cabrillo Power I LLC, NPDES Permit No. CA0001350, April 1, 2006
Attachment 4 - Updated Impingement and Entrainment Assessment
Attachment 5 - Summary of Fish and Target Shellfish Larvae collected from Entrainment and Source Water Studies in the Vicinity of Agua Hedionda Lagoon from June 2005 through May 2006
|
3/14/2008 Public Notice |
San Diego Regional Water Quality Control Board |
|
Agenda Notice for April 9, 2008 San Diego Regional Board Meeting |
3/14/2008 Letter |
San Diego Desal Partners |
San Diego Regional Water Quality Control Board |
|
3/19/2008 Letter |
San Diego Coastkeeper and Surfrider Foundation |
San Diego Regional Water Quality Control Board |
Request for Full Public Hearing on Poseidon's Revised Flow, Entrainment and Impingement Plan |
3/20/2008 Letter |
California Coastal Commission |
San Diego Regional Water Quality Control Board |
|
3/26/2008 Letter |
Industrial Environmental Association |
San Diego Regional Water Quality Control Board |
|
3/26/2008 Letter |
City of Carlsbad, Office of the City Council |
San Diego Regional Water Quality Control Board |
|
3/26/2008 Letter |
Hubbs-SeaWorld Research Institute |
San Diego Regional Water Quality Control Board |
|
3/26/2008 Letter |
San Diego North Economic Development Council |
San Diego Regional Water Quality Control Board |
|
3/26/2008 Letter |
Andrew Davis, Carlsbad Aquafarm |
San Diego Regional Water Quality Control Board |
|
3/27/2008 Letter |
Sweetwater Authority |
San Diego Regional Water Quality Control Board |
|
3/27/2008 Letter |
Christine Kehoe, Senate, 39th District |
San Diego Regional Water Quality Control Board |
|
3/27/2008 Letter |
San Diego Regional Economic Development Corporation |
San Diego Regional Water Quality Control Board |
|
3/27/2008 Letter |
San Dieguito River Valley Regional Open Space Park |
San Diego Regional Water Quality Control Board |
|
3/27/2008 Letter |
California Coastal Coalition |
San Diego Regional Water Quality Control Board |
|
3/27/2008 Letter |
San Diego County Building & Construction Trades Council |
San Diego Regional Water Quality Control Board |
|
3/27/2008 Letter |
Robert Simmons, Attorney-at-Law |
San Diego Regional Water Quality Control Board |
|
3/27/2008 Letter |
Rainbow Municipal Water District |
San Diego Regional Water Quality Control Board |
|
3/28/2008 Letter |
Vallecitos Water District |
San Diego Regional Water Quality Control Board |
|
3/28/2008 Letter |
City of Oceanside |
San Diego Regional Water Quality Control Board |
|
3/28/2008 Letter |
San Diego Regional Chamber of Commerce |
San Diego Regional Water Quality Control Board |
|
3/28/2008 Letter |
Agua Hedionda Lagoon Foundation |
San Diego Regional Water Quality Control Board |
|
3/28/2008 Letter |
Shapery Enterprises |
San Diego Regional Water Quality Control Board |
|
3/31/2008 Letter |
Santa Fe Irrigation District |
San Diego Regional Water Quality Control Board |
|
3/31/2008 Letter |
Farm Bureau, San Diego County |
San Diego Regional Water Quality Control Board |
|
3/31/2008 Letter |
Carlsbad Chamber of Commerce |
San Diego Regional Water Quality Control Board |
|
3/31/2008 Letter |
Sierra Club, San Diego Chapter |
San Diego Regional Water Quality Control Board |
|
3/31/2008 Letter |
Denise Moreno Ducheny, State Senator, 40th District |
San Diego Regional Water Quality Control Board |
|
3/31/2008 Letter |
Valley Center Municipal Water District |
San Diego Regional Water Quality Control Board |
|
4/1/2008 Letter |
Bill Horn, Supervisor 5th District |
San Diego Regional Water Quality Control Board |
|
4/1/2008 Letter |
Mary Salas, 78th Assembly District |
San Diego Regional Water Quality Control Board |
|
4/2/2008 Letter |
Coast Law Group |
San Diego Regional Water Quality Control Board |
|
4/2/2008 Letter |
San Diego Coastkeeper and Surfrider Foundation |
San Diego Regional Water Quality Control Board |
|
4/2/2008 Letter |
San Diego County Water Authority |
San Diego Regional Water Quality Control Board |
|
4/2/2008 Letter |
Poseidon Resources Corporation |
San Diego Regional Water Quality Control Board |
Response to California Coastal Commission request for postponement |
4/2/2008 Letter |
Poseidon Resources Corporation |
San Diego Regional Water Quality Control Board |
Response to San Diego Coastkeeper and Surfrider Foundation request for postponement |
4/2/2008 Letter |
Metropolitan Water District |
San Diego Regional Water Quality Control Board |
|
4/2/2008 Letter |
City of Coronado |
San Diego Regional Water Quality Control Board |
Comment Letter for tentative Resolution No. R9-2008-0039 |
4/2/2008 Letter |
Assemblymember Martin Garrick, Assembly, California Legislature, 74th District |
San Diego Regional Water Quality Control Board |
|
4/4/2008 |
Chiara Clemente, Deborah Woodward, Michael Porter, San Diego Regional Water Quality Control Board |
John H. Robertus, San Diego Regional Water Quality Control Board |
|
4/7/2008 Letter |
California State Lands Commission |
San Diego Regional Water Quality Control Board |
Comment Letter for tentative Resolution No. R9-2008-0039 |
4/9/2008 Report |
San Diego Regional Water Quality Control Board |
|
Executive Officer Summary Report and Supporting Documentation (See Item No. 7) |
4/9/2008 Report |
San Diego Regional Water Quality Control Board |
|
Supplemental Executive Officers Report and Supporting Documentation (See Item No. 7) |
4/9/2008 Presentation |
Poseidon Resources Corporation |
|
Flow, Entrainment and Impingement Minimization Plan PowerPoint Presentation |
4/9/2008 Errata |
San Diego Regional Water Quality Control Board |
|
|
4/9/2008 Transcript |
San Diego Regional Water Quality Control Board |
|
Partial Transcript prepared by Lori Costa, Executive Assistant |
4/9/2008 Transcript |
Kennedy Court Reporters, Inc. |
San Diego Regional Water Quality Control Board |
|
4/17/2008 Letter and Resolution |
San Diego Regional Water Quality Control Board |
Poseidon Resources Corporation |
Final Resolution No. R9-2008-0039
|
4/17/2008 Email |
Chiara Clemente, San Diego Regional Water Quality Control Board |
Peter MacLaggan, Poseidon Resources |
Request for clarification of certain aspects of Poseidon's Flow, Entrainment and Impingement Minimization Plan dated March 6, 2008 |
4/17/2008 Email |
Peter MacLaggan, Poseidon Resources |
Chiara Clemente, San Diego Regional Water Quality Control Board |
|
4/17/2008 Email |
Chiara Clemente, San Diego Regional Water Quality Control Board |
Peter MacLaggan, Poseidon Resources |
|
4/29/2008 Email |
Peter MacLaggan, Poseidon Resources |
Chiara Clemente, San Diego Regional Water Quality Control Board |
|
4/30/2008 Email |
Peter MacLaggan, Poseidon Resources |
Chiara Clemente, San Diego Regional Water Quality Control Board |
Response to request for clarification of certain aspects of Poseidon's Flow, Entrainment and Impingement Minimization Plan dated March 6, 2008 |
5/6/2008 Email |
Sara Townsend, California Coastal Commission |
Chiara Clemente, San Diego Regional Water Quality Control Board |
Transmits a copy of a Power Point presentation by the Coastal Commission's contractor.
|
8/6/2008 Report |
California Coastal Commission |
|
Final Adopted Findings (Items W4a). Addendum to E-06-013 - Poseidon Resources (Channelside), LLC – Carlsbad Desalination Facility |
11/14/2008 Plan |
Poseidon Resources |
San Diego Regional Water Quality Control Board |
Submittal of Marine Life Mitigation Plan in response to Regional Board Resolution No. R9-2008-0039 |
11/21/2008 Report |
California Coastal Commission |
|
California Coastal Commission Recommended Revised Condition Compliance Findings (Item W16a). Condition Compliance for CDP No. E-06-013 – Poseidon Resources (Channelside), LLC; Special Condition 8: Submittal of a Marine Life Mitigation Plan (Approved by Coastal Commission 12/10/08) |
12/2/2008 Letter |
San Diego Regional Water Quality Control Board |
Poseidon Resources |
Review of Proposed Poseidon Resources Marine Life Mitigation Plan
|
12/9/2008 Letter |
Poseidon Resources |
San Diego Regional Water Quality Control Board |
Letter in response to Regional Board 12/2/2008 review of Proposed Marine Life Mitigation Plan |
1/2/2009 Public Notice |
San Diego Regional Water Quality Control Board |
|
Corrected Notice of Public Hearing California Regional Water Quality Control Board, San Diego Region re: February 11, 2009 Hearing |
1/16/2009 Letter |
San Diego Coastkeeper |
San Diego Regional Water Quality Control Board |
Letter regarding Regional Board's Closed Session of Ongoing Litigation, Surfrider Foundation v. San Diego Regional Board |
1/16/2009 Email |
Tom Luster, California Coastal Commission |
Brian Kelley, San Diego Regional Water Quality Control Board |
Transmits a copy of the Coastal Commission's adopted findings for the Carlsbad Desalination Project and a link to the Commission's approval of the Marine Life Mitigation Plan |
1/19/2009 Letter |
Hubbs-SeaWorld Research Institute |
San Diego Regional Water Quality Control Board |
Comment Letter regarding Regional Board's February 11, 2009 meeting to consider Poseidon's Marine Life Mitigation Plan |
1/19/2009 Letter |
Industrial Environmental Association |
San Diego Regional Water Quality Control Board |
Comment Letter regarding Regional Board's February 11, 2009 meeting to consider Poseidon's Marine Life Mitigation Plan |
1/19/2009 Letter |
Carlsbad Chamber of Commerce |
San Diego Regional Water Quality Control Board |
Comment Letter regarding Regional Board's February 11, 2009 meeting to consider Poseidon's Marine Life Mitigation Plan |
1/19/2009 Letter |
City of Carlsbad, Office of the Mayor |
San Diego Regional Water Quality Control Board |
Comment Letter regarding Regional Board's February 11, 2009 meeting to consider Poseidon's Marine Life Mitigation Plan |
1/19/2009 Letter |
San Diego County Building & Construction Trades Council, AFL-CIO |
San Diego Regional Water Quality Control Board |
Comment Letter regarding Regional Board's February 11, 2009 meeting to consider Poseidon's Marine Life Mitigation Plan |
1/21/2009 Letter |
Latham & Watkins, LLP |
San Diego Regional Water Quality Control Board |
Comment Letter regarding Regional Board's February 11, 2009 meeting to consider Poseidon's Marine Life Mitigation Plan |
1/21/2009 Letter |
Sweetwater Authority |
San Diego Regional Water Quality Control Board |
Comment Letter regarding Regional Board's February 11, 2009 meeting to consider Poseidon's Marine Life Mitigation Plan |
1/21/2009 Letter |
San Diego County Taxpayers Association |
San Diego Regional Water Quality Control Board |
Comment Letter regarding Regional Board's February 11, 2009 meeting to consider Poseidon's Marine Life Mitigation Plan |
1/21/2009 Letter |
The Flower Fields at Carlsbad Ranch |
San Diego Regional Water Quality Control Board |
Comment Letter regarding Regional Board's February 11, 2009 meeting to consider Poseidon's Marine Life Mitigation Plan |
1/21/2009 Letter |
Santa Fe Irrigation District |
San Diego Regional Water Quality Control Board |
Comment Letter regarding Regional Board's February 11, 2009 meeting to consider Poseidon's Marine Life Mitigation Plan |
1/21/2009 Letter |
Olivenhain Municipal Water District |
San Diego Regional Water Quality Control Board |
Comment Letter regarding Regional Board's February 11, 2009 meeting to consider Poseidon's Marine Life Mitigation Plan |
1/21/2009 Letter |
Councilmember Benjamin Hueso, San Diego City Council President |
San Diego Regional Water Quality Control Board |
Comment Letter regarding Regional Board's February 11, 2009 meeting to consider Poseidon's Marine Life Mitigation Plan |
1/21/2009 Letter |
Assemblymember Martin Garrick, Assembly, California Legislature, 74th District |
San Diego Regional Water Quality Control Board |
Comment Letter regarding Regional Board's February 11, 2009 meeting to consider Poseidon's Marine Life Mitigation Plan |
1/21/2009 Letter |
Senator Christine Kehoe, California State Senate, 39th District |
San Diego Regional Water Quality Control Board |
Comment Letter regarding Regional Board's February 11, 2009 meeting to consider Poseidon's Marine Life Mitigation Plan |
1/21/2009 Letter |
Don Christiansen, Carlsbad Resident |
San Diego Regional Water Quality Control Board |
Comment Letter regarding Regional Board's February 11, 2009 meeting to consider Poseidon's Marine Life Mitigation Plan |
1/21/2009 Letter |
Vallecitos Water District |
San Diego Regional Water Quality Control Board |
Comment Letter regarding Regional Board's February 11, 2009 meeting to consider Poseidon's Marine Life Mitigation Plan |
1/21/2009 Letter |
Agua Hedionda Lagoon Foundation |
San Diego Regional Water Quality Control Board |
Comment Letter regarding Regional Board's February 11, 2009 meeting to consider Poseidon's Marine Life Mitigation Plan |
1/21/2009 Letter |
San Diego North Economic Development Council |
San Diego Regional Water Quality Control Board |
Comment Letter regarding Regional Board's February 11, 2009 meeting to consider Poseidon's Marine Life Mitigation Plan |
1/21/2009 Letter |
Farm Bureau, San Diego County |
San Diego Regional Water Quality Control Board |
Comment Letter regarding Regional Board's February 11, 2009 meeting to consider Poseidon's Marine Life Mitigation Plan |
1/22/2009 Letter |
Senator Mark Wyland, California State Senate, 38th District |
San Diego Regional Water Quality Control Board |
Comment Letter regarding Regional Board's February 11, 2009 meeting to consider Poseidon's Marine Life Mitigation Plan |
1/22/2009 Letter |
Robert Simmons, Counselor-at-Law |
San Diego Regional Water Quality Control Board |
Comment Letter regarding Regional Board's February 11, 2009 meeting to consider Poseidon's Marine Life Mitigation Plan |
1/23/2009 Letter |
San Diego Regional Chamber of Commerce |
San Diego Regional Water Quality Control Board |
Comment Letter regarding Regional Board's February 11, 2009 meeting to consider Poseidon's Marine Life Mitigation Plan |
1/23/2009 Letter |
Valley Center Water District |
San Diego Regional Water Quality Control Board |
Comment Letter regarding Regional Board's February 11, 2009 meeting to consider Poseidon's Marine Life Mitigation Plan |
1/23/2009 Letter |
Council Member Julianne Nygaard, Retired, City of Carlsbad |
San Diego Regional Water Quality Control Board |
Comment Letter regarding Regional Board's February 11, 2009 meeting to consider Poseidon's Marine Life Mitigation Plan |
1/23/2009 Email |
Catherine Hagan, San Diego Regional Water Quality Control Board |
Christopher Garrett, Latham & Watkins, LLP |
Acknowledgement of and initial response to Latham & Watkins January 21 comment letter regarding the Regional Board's February 11, 2009 meeting to consider Poseidon's Marine Life Mitigation Plan |
1/26/2009 Letter |
San Diego County Water Authority |
San Diego Regional Water Quality Control Board |
Comment Letter regarding Regional Board's February 11, 2009 meeting to consider Poseidon's Marine Life Mitigation Plan |
1/26/2009 Letter |
Poseidon Resources |
San Diego Regional Water Quality Control Board |
|
1/26/2009 Letter |
Latham & Watkins, LLP |
San Diego Regional Water Quality Control Board |
Statement of Procedural Objections and Request for Alternate Procedures at February 11, 2009 Board Meeting |
1/26/2009 Report |
David Mayer, Ph.D., Tenera Environmental |
San Diego Regional Water Quality Control Board |
|
1/26/2009 Report |
Chris Nordby, Nordby Biological Consulting |
San Diego Regional Water Quality Control Board |
|
1/26/2009 Report |
Scott A. Jenkins, Ph.D, Scripps Institution of Oceanography |
San Diego Regional Water Quality Control Board |
Expert Opinion on Poseidon's Impingement and Entrainment Assessment |
1/26/2009 Letter and Appendices |
Latham & Watkins, LLP |
San Diego Regional Water Quality Control Board |
Comment Letter with appendices regarding Regional Board's February 11, 2009 meeting to consider Poseidon's Marine Life Mitigation Plan
Volume 1 November 14, 2009 Poseidon Resources Marine Life Mitigation Plan
PowerPoint Presentation Prepared by Dr. Raimondi: Review of Carlsbad Seawater Desalinization Project (CDP)
Clean Water Act Section 316(b) Impingement Mortality and Entrainment Characterization Study. Cabrillo Power 1 LLC, Encina Power Station. January 2008. Tenera Environmental.
February 19, 2008 Regional Board Comment Letter on 2/12/07 Revised Plan
March 6, 2008 Revised Flow, Entrainment. and Impingement Minimization Plan
March 7, 2008 Poseidon Response to February 19, 2008 Regional Board Comments
March 7, 2008 Email from Eric Becker to Tom Luster;wpaznokas@dfg.ca.gov; Sharon_Taylor@fws.gov; Peter MacLaggan: bruce@sdcoastkeeper.org: gabe@sdcoastkeeper.org; Judy Brown;rwilson@surfrider.org, copied to John Odermatt; Mike McCann.
April 2, 2008 Email from S. Townsend to various people, including E Becker.
April 4, 2008 RWQCB Technical Report, Review of Carlsbad Seawater Desalination Plant Flow, Entrainment and Impingement Minimization Plan
April 9, 2008 Reporters Transcript of Proceedings. California Regional Water Quality Control Board, San Diego Region, Partial Transcript of Proceedings, Public Hearing
Volume 2 April 10, 2008 Email from P. MacLaggan to J Robertus. Subject: Re: Update on Attendees for May 1-2 Meetings
April 10, 2008 Email from P. MacLaggan to J. Robertus. Subject: May 1 Desal Mitigation Meeting.
April 17, 2008 Email from C. Clemente to P. MacLaggan. Subject: Poseidon's CDP Plan - questions regarding IM&E Assessments
April 22, 2008 Email from J. Steinbeck to P. Raimondi
April 24, 2008 Email from J. Steinbeck to D Mayer
April 30, 2008 Email from P. MacLaggan to C Clemente. copied to Brian Kelley; David Barker: Deborah Woodward; Mike McCann. Subject: Re: Poseidon's CDP Plan - questions regarding IM&E assessments
July 8, 2008 Email from S. Townsend to various people, including J. Robertus Subject: Poseidon' Marine Life Mitigation Plan
August 5, 2008 Email from G Newton to J. Brown Subject: Fwd: RE:Coordination re: Poseidon?
August 6, 2008 California Coastal Commission Final Adopted Findings (Item W4a). Application File No. E-06- 013 Permittee Poseidon Resources (Channelside) LLC / Cabrillo Power II LLC
August 6, 2008 Reporter's Transcript of Proceedings. California Coastal Commission Meeting. Agenda Items Nos. 4.a., 5.a., 5.b.. Vol. 2 of 2. pgs 163-347.
August 22, 2008 State Lands Commission Final Lease Amendment No. PRC 8727.1
November 21, 2008 California Coastal Commission Recommended Revised Condition Compliance Findings (Item - W16a). Condition Compliance for CDP No E-06-013 - Poseidon Resources (Channelside). LLC; Special Condition 8: Submittal of a Marine Life Mitigation Plan
December 2, 2008 Letter from RWQCB to Poseidon re: Review of Proposed Poseidon Resources Carlsbad Desalination Plant Marine Life Mitigation Plan, Resolution No. R9-2008-0039
April 2007 Updated 2005 Urban Water Management Plan. San Diego County Water Authority.
December 18, 2001 National Pollutant Discharge Elimination System: Regulations Addressing Cooling Water Intake Structures for New Facilities, Final Rule. 66 Fed. Reg 65256
July 9, 2004 National Pollutant Discharge Elimination System - Final Regulations to Establish Requirements for Cooling Water Intake Structures at Phase II Existing Facilities, Final Rule. 69 Fed. Reg. 41576
July 9, 2007 National Pollutant Discharge Elimination System - Suspension of Regulations Establishing Requirements for Cooling Water Intake Structures at Phase II Existing Facilities. 72 Fed. Reg. 37107
|
1/26/2009 Letter and Enclosures |
Latham & Watkins, LLP |
San Diego Regional Water Quality Control Board |
Cover letter )with the following enclosures:
Declaration of Peter MacLaggan
Declaration of Jessica H. Jones
January 26, 2009 Letter from Peter MacLaggan to members of the Regional Board |
1/26/2009 Letter |
Poseidon Resources |
San Diego Regional Water Quality Control Board |
Comment Letter regarding Regional Board's February 11, 2009 meeting to consider Poseidon's Marine Life Mitigation Plan
|
1/27/2009 Letter |
Latham & Watkins, LLP |
San Diego Regional Water Quality Control Board |
Letter for the removal of documents erroneously attached to Exhibit 16 of Peter MacLaggan's statement contained in Latham & Watkins 1/26/2009 submittal
|
1/29/2009 Letter |
San Diego Regional Water Quality Control Board |
Latham & Watkins, LLP |
Response to Latham & Watkins 1/21/2009 and 1/26/2009 letters regarding procedural issues raised concerning the February 11, 2009 Regional Board Agenda Notice |
1/29/2009 Email |
Catherine Hagan, San Diego Regional Water Quality Control Board |
Amanda Halter and Christopher Garrett with Latham & Watkins, LLP, Gabriel Solmer, and Marco Gonzales with Coast Law Group |
Transmits a copy of the Executive Officer's Summary Report for the Regional Board's February 11, 2009 meeting to consider Poseidon's Marine Life Mitigation Plan |
1/30/2009 Letter |
California Environmental Protection Agency |
San Diego Regional Water Quality Control Board |
Comment Letter regarding Regional Board's February 11, 2009 meeting to consider Poseidon's Marine Life Mitigation Plan |
2/2/2009 Letter |
California Department of Food & Agriculture |
San Diego Regional Water Quality Control Board |
Comment Letter regarding Regional Board's February 11, 2009 meeting to consider Poseidon's Marine Life Mitigation Plan |
2/2/2009 Letter |
Governor Arnold Schwarzenegger, State of California |
San Diego Regional Water Quality Control Board |
Comment Letter regarding Regional Board's February 11, 2009 meeting to consider Poseidon's Marine Life Mitigation Plan |
2/2/2009 Letter |
California Natural Resources Agency |
San Diego Regional Water Quality Control Board |
Comment Letter regarding Regional Board's February 11, 2009 meeting to consider Poseidon's Marine Life Mitigation Plan |
2/2/2009 Letter |
California Department of Fish and Game |
San Diego Regional Water Quality Control Board |
Comment Letter regarding Regional Board's February 11, 2009 meeting to consider Poseidon's Marine Life Mitigation Plan |
2/2/2009 Letter and Enclosure |
Latham & Watkins, LLP |
San Diego Regional Water Quality Control Board |
|
2/2/2009 Letter and Enclosures |
Poseidon Resources |
San Diego Regional Water Quality Control Board |
Letter transmitting 3 Volumes for the Regional Board's consideration on Item No. 6 at their February 11, 2009 meeting
Volume 1 Poseidon Summary Chart and Detailed Response to Executive Officer Summary Report Released January 29, 2009
Poseidon Request for Regional Board Action Re: Conduct of Hearing for Item No. 6
Poseidon Proposed Resolution For Adoption By Regional Board On February 11th Approving Submitted Marine Life Mitigation Plan, Finding Compliance With Resolution No. R9-2008-0039, and Compliance With Resolution R9-2006-0065, and Making Appropriate Findings
Volume 2 Poseidon’s Response to Staff’s “Overarching Concern” Re: The Inclusion of a “Specific Mitigation Alternative” in the Marine Life Mitigation Plan
Supplemental Statement and Evidence Presented by Chris Nordby Re: Impingement Issues
Summary Charts of Staff Issues and Poseidon Responses to Regional Board Staff Review Letters and Technical Report of February 19, 2008 and April 4, 2008
Offer of Proof Regarding Testimony and Evidence From Poseidon
Coastal Commission Recommended Revised Condition Compliance Findings for CDP No. E-06-013 - Poseidon Resources (Channelside), LLC; Special Condition 8: Submittal of a Marine Life Mitigation Plan, adopted December 10, 2008
Volume 3 Annotated Index of Authority and Technical Studies and Scientific Studies Supporting Board Decision
National Pollutant Discharge Elimination System: Regulations Addressing Cooling Water Intake Structures for New Facilities, 66 Fed. Reg. 65256, 65274 (December 18, 2001) (to be codified at 40 C.F.R. pts. 9,122, 123, 124, 125) (2009)
EPA Requirements Applicable to Cooling Water Intake Structures for New Facilities Under Section 316(B) of the Act, 40 C.F.R. §§ 125.84(b)(2), 125.84(c)(1) (2009)
EPA Requirements Applicable to Cooling Water Intake Structures for New Facilities Under Section 316(B) of the Act, 40 C.F.R.§§ 125.94(a)(1)(ii) (2009)
John Boreman et al., Impacts of Power Plant Intake Velocities on Fish, in TOPICAL BRIEFS: FISH AND WILDLIFE RESOURCES AND ELECTRIC POWER GENERATION, NO. 1 (Power Plant Project, Office of Biological Services, Fish and Wildlife Service, U.S. Department of the Interior) (1977)
A.G. Christianson et al., Reviewing Environmental Impact Statements - Power Plant Cooling Systems, Engineering Aspects (National Thermal Pollution Research Program, Pacific Northwest Environmental Research Laboratory, EPA-660/2-73-016) (1973)
John C. Sonnichsen, Jr. et al, A Review of Thermal Power Plant Intake Structure Designs and Related Environmental Considerations (Hanford Engineering Development Laboratory, HEDL–TME 73–24, UC–12) (1973)
A.W.H. Turnpenny, The Behavioral Basis of Fish Exclusion from Coastal Power Station Cooling Water Intakes, in RESEARCHREPORT- CENTRAL ELECTRICITY (Vol.RD/L/2201/R88) (1988)
King, W. Instructional Memorandum RB-44: Review of NPDES (National Pollutant Discharge Elimination System) permit applications processed by the EPA (Environmental Protection Agency) or by the State with EPA oversight.' In: U.S. Fish and Wildlife Service Navigable Waters Handbook.
Electric Power Research Institute, Inc.,Catalog of Assessment Methods for Evaluating the Effects of Power Plant Operations on Aquatic Communities (EPRI,TR-112013) (1999)
Electric Power Research Institute, Inc.,Evaluation of Biocriteria as a Concept Approach, and Tool for Assessing Impacts of Impingement and Entrainment Under § 316(b) of the Clean Water Act (EPRI, TR-114007) (2000)
Electric Power Research Institute, Inc.,Technical Evaluation of the Utility of Intake Approach Velocity as an Indicator of Potential Adverse Environmental Impact under § 316(b) (EPRI, TR-1000731)(2000)
John Steinbeck et al, Assessing Power Plant Cooling Water Intake System Entrainment Impacts (California Energy Commission, CEC-700-2007-010) (2007)
Hany Elwany et al, Agua Hedionda Lagoon Hydrodynamic Studies (Tenera Environmental Technical Report, CE No.05-10) (2005)
Scott A. Jenkins & Joseph Wasyl, Coastal Processes Effects of Reduced Flows at Agua Hedionda Lagoon (Study submitted to Tenera Environmental and Poseidon Resources) (2006)
Tetra Tech, Inc., Agua Hedionda Watershed Water Quality Analysis and Recommendations Report (Report submitted to City of Vista) (2007)
NWS, 2009, “National Weather Service Daily Climate Reports,” http://www.wrh.noaa.gov/sgx/obs/rtp/
Curriculum Vitae of David L. Mayer, PhD. - President / Principal Scientist – Tenera Environmental Inc. |
2/3/2009 Letter |
Assemblymember Mary Salas, Assembly, California Legislature, 79th District |
San Diego Regional Water Quality Control Board |
Comment Letter regarding Regional Board's February 11, 2009 meeting to consider Poseidon's Marine Life Mitigation Plan |
2/5/2009 Letter |
Sierra Club |
San Diego Regional Water Quality Control Board |
Comment Letter regarding Regional Board's February 11, 2009 meeting to consider Poseidon's Marine Life Mitigation Plan |
2/6/2009 Letter |
Mayor Jerry Sanders, City of San Diego |
San Diego Regional Water Quality Control Board |
Comment Letter regarding Regional Board's February 11, 2009 meeting to consider Poseidon's Marine Life Mitigation Plan |
2/9/2009 Email |
Carlsbad Desalination Project |
Chiara Clemente, San Diego Regional Water Quality Control Board |
Comments regarding Regional Board's February 11, 2009 meeting to consider Poseidon's Marine Life Mitigation Plan |
2/9/2009 Email |
Ed Kimura, Sierra Club |
Mike Porter, Michelle Mata, and Chiara Clemente, San Diego Regional Water Quality Control Board |
Comments regarding Regional Board's February 11, 2009 meeting to consider Poseidon's Marine Life Mitigation Plan |
2/9/2009 Email |
Tom Luster, California Coastal Commission |
Brian Kelley, San Diego Regional Water Quality Control Board |
Information for the Regional Board's February 11, 2009 meeting to consider Poseidon's Marine Life Mitigation Plan |
2/10/2009 Letter |
Coast Law Group, LLP |
San Diego Regional Water Quality Control Board |
Environmental Groups' response to Poseidon's comments regarding the Regional Board's February 11, 2009 meeting to consider the Marine Life Mitigation Plan |
2/11/2009 EOSR |
San Diego Regional Water Quality Control Board |
San Diego Regional Water Quality Control Board |
Executive Officer Summary Report for Item 6 of the Regional Board's February 11, 2009 meeting to consider Poseidon's Marine Life Mitigation Plan (See Item 6) |
2/11/2009 Revised EOSR |
San Diego Regional Water Quality Control Board |
San Diego Regional Water Quality Control Board |
Revised Executive Officer Summary Report for Item 6 of the Regional Board's February 11, 2009 meeting to consider Poseidon's Marine Life Mitigation Plan (See Item 6) |
2/11/2009 Presentation |
Peter MacLaggan, Poseidon Resources |
San Diego Regional Water Quality Control Board |
Power Point presentation for Item 6 at the Regional Board's 2/11/2009 meeting |
2/11/2009 Presentation |
Marco Gonzalez, Coast Law Group, LLP |
San Diego Regional Water Quality Control Board |
Power Point presentation for Item 6 at the Regional Board's 2/11/2009 meeting to consider Poseidon's Marine Life Mitigation Plan |
2/25/2009 Letter |
Assembly California Legislature |
San Diego Regional Water Quality Control Board |
Comment Letter regarding Regional Board's April 8, 2009 meeting to consider Poseidon's Marine Life Mitigation Plan |
3/2/2009 Email |
Catherine Hagan, San Diego Regional Water Quality Control Board |
Chiara Clemente, Brian Kelley, Deborah Woodward and Michelle Mata, San Diego Regional Water Quality Control Board |
Documents related to other agencies requirements regarding the Carlsbad Desalination Project:
Planning Commission Resolution No. 6090
Planning Commission Resolution No. 6091
Exhibit "EIR-B", City of Carlsbad
Planning Commission Resolution No. 6088
State Lands Commission Amendment of Lease PRC 8727
California Coastal Commission Recommended Revised Condition Compliance Findings (Item W16a). Condition Compliance for CDP No. E-06-013 – Poseidon Resources (Channelside), LLC; Special Condition 8: Submittal of a Marine Life Mitigation Plan (Approved by Coastal Commission 12/10/08)
|
3/9/2009 Public Notice |
San Diego Regional Water Quality Control Board |
|
Notice of Public Hearing California Regional Water Quality Control Board, San Diego Region re: April 8, 2009 Hearing |
3/9/2009 Email |
Amanda Halter with Latham & Watkins, LLP |
Catherine Hagan, San Diego Regional Water Quality Control Board |
Minimization Plan and Attachments
Attachment 1- EPS's 2008 Daily Flow Data
Attachment 2 - Cost Estimate of Subsurface Intake Alternatives
Attachment 3 - Impingement Results, G1 - Traveling Screens and Bar Racks Weekly Surveys, G2 - Heat Treatment Surveys
Attachment 4 - Proposal for Information Collection Clean Water Act 316(b), Encina Power Station, Cabrillo Power I LLC, NPDES Permit No. CA0001350, April 1, 2006
Attachment 5 – Estimation of the Potential for Impingement Should the CDP Operate in Stand-Alone Mode
Attachment 6 - Carlsbad Desalination Facility, Encina Power Station Summary of Fish and Target Shellfish Larvae collected from Entrainment and Source Water Studies in the Vicinity of Agua Hedionda Lagoon from June 2005 through May 2006
Attachment 7 – Mitigation Computation Based on Impingement Assessment - Chris Nordby
Attachment 8 – Numbers and Biomass of Species Collected During 2004/2005 Sampling Period |
3/9/2009 |
San Diego Regional Water Quality Control Board |
|